December 2006 - John
Martin and Joe Velie made a trip to Wazee on the 23 and placed the
"bird" on the far ridge just to the right of guide line to pipes.
They used two 100lb lift bags and scootered the concrete structure out
to it's resting place. They also made some minor adjustments to
the line going to the deep platform and pulled the ball under for the
winter. Visibility was a little better and the water temp was
about 40 degrees.
January 2007 - It is the plan at this
point to do further work and install the dive platform in the early part
of January. Please watch the Pipes Point thread on Blackdive.net
for more details. If anyone is going to down prior to our next
work day at Pipes Point, John Preston needs someone to take some GPS
coordinates. Please contact him at by
clicking here.
February 2007 - The date set to install
the new dive platform is February 17th and 18th. If the ice is too
thin to drive on Jackson County will have a crew to drag the platform
out on the ice. (Jackson County would like a minimum of 12" of ice
before driving on it.) (Go to page four
for installation details.)

Pipes Point Platform being built by
Jackson County

Diver's survey Pipes Point projected platform site
before installation.
Pipes Point Page Four